TEKEEY Tools

Concrete Calculator

Enter your dimensions and mix ratio to estimate concrete volume and the indicative cement, sand and ballast quantities required.

For any load-bearing element — columns, beams, structural or suspended slabs — the mix or concrete grade must come from your structural engineer's design, not a rule-of-thumb choice here.

Wet volume

3 m³

Dry volume (bulked)

4.62 m³

Cement (incl. wastage)

20 bags

Sand (incl. wastage)

1.45 m³

Ballast (incl. wastage)

2.8 m³

Quantities include standard site wastage allowances — cement +3%, sand +10%, ballast +6% — reflecting how each material is typically lost to spillage and handling on site.

Indicative material cost
Cement (20 bags)Ksh 15,000
Sand (1.45 m³)Ksh 4,495
Ballast (2.8 m³)Ksh 7,000
Total materialsKsh 26,495

Based on indicative Nairobi-area supplier prices. Materials cost only — excludes labour, transport and delivery. Confirm current rates with your supplier before ordering.

Need help sourcing materials or labour?

Share your details and TEKEEY can help you plan procurement and site works.

No obligation. Your details are only used to follow up on this request.

Need a professional estimate or BQ?

This tool gives you a planning-stage figure. For a certified estimate, request TEKEEY's professional services.

Related service: Construction

Estimates provided by TEKEEY Tools are preliminary and intended for planning purposes only. Actual construction costs, quantities and engineering requirements depend on project-specific designs, site conditions, specifications, material prices and professional assessment.