Cement Calculator

Enter your total concrete volume and mix ratio to estimate the number of 50kg cement bags — plus sand and ballast — you'll need.

Not sure of your volume? Use the Concrete Calculator first.

For any load-bearing element — columns, beams, structural or suspended slabs — the mix or concrete grade must come from your structural engineer's design, not a rule-of-thumb choice here.

Cement (incl. wastage)

20 bags

Sand (incl. wastage)

1.45 m³

Ballast (incl. wastage)

2.8 m³

Quantities include standard site wastage allowances — cement +3%, sand +10%, ballast +6% — reflecting how each material is typically lost to spillage and handling on site.

Indicative material cost
Cement (20 bags)Ksh 15,000
Sand (1.45 m³)Ksh 4,495
Ballast (2.8 m³)Ksh 7,000
Total materialsKsh 26,495

Based on indicative Nairobi-area supplier prices. Materials cost only — excludes labour, transport and delivery. Confirm current rates with your supplier before ordering.

Need this delivered to site?

Share your details and TEKEEY can connect you with vetted material suppliers.

No obligation. Your details are only used to follow up on this request.

Need a professional estimate or BQ?

This tool gives you a planning-stage figure. For a certified estimate, request TEKEEY's professional services.

Related service: Construction

Estimates provided by TEKEEY Tools are preliminary and intended for planning purposes only. Actual construction costs, quantities and engineering requirements depend on project-specific designs, site conditions, specifications, material prices and professional assessment.