BQ & Quantity Surveying
How to Prepare a Bill of Quantities (BQ)
What a BQ is, why it matters, and the steps involved in producing one you can actually build from.
A Bill of Quantities (BQ) is an itemised list of every material, labour item and cost element needed to complete a project — organised by section (substructure, superstructure, roofing, finishes, and so on), with a quantity, unit, rate and total for each item.
Why it matters
- It turns a design into a measurable, comparable cost — you can get like-for-like quotes from different contractors
- It's the reference document for tracking what's been paid for versus what's actually been built
- It reduces disputes, because scope and quantities are documented upfront rather than agreed verbally
- It's required for most formal tendering and financing processes
How a professional BQ is prepared
- Start from finalised architectural and structural drawings — a BQ prepared before the design is settled will need revision
- Measure quantities section by section, following a standard method of measurement
- Apply current market rates for materials and labour in your area
- Add preliminaries (site setup, supervision, temporary works) and a contingency allowance
- Have it reviewed by a quantity surveyor before it's used to tender or budget
Preliminary vs. professional BQs
A preliminary BQ — like the one our BQ Estimator produces — gives you section-level figures for early planning. It is not a substitute for a professional BQ measured from your actual drawings, which is what you should tender or budget against once your design is final.