BQ & Quantity Surveying

How to Prepare a Bill of Quantities (BQ)

What a BQ is, why it matters, and the steps involved in producing one you can actually build from.

A Bill of Quantities (BQ) is an itemised list of every material, labour item and cost element needed to complete a project — organised by section (substructure, superstructure, roofing, finishes, and so on), with a quantity, unit, rate and total for each item.

Why it matters

  • It turns a design into a measurable, comparable cost — you can get like-for-like quotes from different contractors
  • It's the reference document for tracking what's been paid for versus what's actually been built
  • It reduces disputes, because scope and quantities are documented upfront rather than agreed verbally
  • It's required for most formal tendering and financing processes

How a professional BQ is prepared

  • Start from finalised architectural and structural drawings — a BQ prepared before the design is settled will need revision
  • Measure quantities section by section, following a standard method of measurement
  • Apply current market rates for materials and labour in your area
  • Add preliminaries (site setup, supervision, temporary works) and a contingency allowance
  • Have it reviewed by a quantity surveyor before it's used to tender or budget

Preliminary vs. professional BQs

A preliminary BQ — like the one our BQ Estimator produces — gives you section-level figures for early planning. It is not a substitute for a professional BQ measured from your actual drawings, which is what you should tender or budget against once your design is final.

Try the BQ Estimator

Have a question about your project?

Talk to a TEKEEY engineer — free, no obligation.

Book a Consultation

Get a response by WhatsApp or email

Leave your details and we'll follow up.

No obligation. Your details are only used to follow up on this request.