Construction Costs
Construction Cost Per Square Metre: How It's Calculated
What actually goes into a cost-per-m² figure, and why two houses of the same size can cost very different amounts.
"Cost per square metre" is the most common way people estimate a construction budget early — multiply your floor area by a rate, and you have a ballpark figure. It's useful for planning, but it hides a lot of detail.
What the rate actually includes
A realistic cost-per-m² figure should account for the full build, not just materials: foundation and substructure, the structural frame, roofing, doors and windows, plumbing and electrical rough-in and fittings, finishes (floors, walls, ceilings), external works, labour, and a contingency allowance for the unexpected.
Why rates vary so much
- Finishing level — basic, medium or high-end finishes can more than double the cost of the same shell
- Location — site access, transport distance and local labour rates
- Ground conditions — a deep or reinforced foundation on poor soil costs more than a standard one
- Number of floors — multi-storey buildings need a stronger, costlier structural frame
- Design complexity — irregular shapes and large spans cost more than simple rectangular layouts
Using this to plan your budget
A cost-per-m² figure is a planning tool, not a quotation. Use it to set a realistic budget range early, then refine it with a proper Bill of Quantities once your design is settled — the BQ accounts for your actual drawings and specifications rather than a general average.
Have a question about your project?
Talk to a TEKEEY engineer — free, no obligation.
Book a Consultation