Homeowners Guide
Common Construction Mistakes to Avoid
The recurring, avoidable mistakes that cost homeowners the most time and money.
- Starting construction before drawings and approvals are finalised
- Skipping a proper BQ and budgeting from a rough per-m² guess instead
- Hiring a contractor without a written, itemised contract
- Paying ahead of verified progress on site
- Changing the design mid-construction without costing the impact first
- Not budgeting a contingency (10% is a common minimum) for the unexpected
- No independent supervision — relying entirely on the contractor to self-report progress
- Buying materials piecemeal instead of planning procurement in bulk where it's cheaper
The common thread
Almost every costly mistake traces back to the same root cause: moving to the next stage before the current one is properly documented and verified. A clear design, a real BQ, a written contract and independent supervision solve most of the list above.
Have a question about your project?
Talk to a TEKEEY engineer — free, no obligation.
Book a Consultation